Drip irrigation zone budget
Group whole drip lines within a supplied flow capacity.
A clear answer. Here’s how.
Calculates line flow from emitter count × supplied emitter flow, then first-fit packs complete lines into zones in input order. A single line exceeding the supplied capacity is rejected. Up to 1,000 lines. This is a flow budget heuristic, not a pressure/friction model or guarantee of emitter output; zone count may not be minimal.
See a worked example
Worked example
A fixed demonstration, separate from the values you enter above.
- Project CSV
Line,Emitters,LitresPerHour Bed A,24,2 Bed B,18,2 Bed C,30,2
- Available flow per zone (L/h)
- 100
Example result
| Zone | Line | Emitters | Line flow (L/h) | Zone flow (L/h) |
|---|---|---|---|---|
| 1 | Bed A | 24 | 48 | 84 |
| 1 | Bed B | 18 | 36 | 84 |
| 2 | Bed C | 30 | 60 | 60 |
First-fit packing of whole lines in input order. Uses a supplied available flow budget; pressure, pipe friction and emitter performance are not modelled. This heuristic need not minimise zone count.